Records the technical data of every take. It is filled in by the 2nd AC and travels with the rushes to the DIT, editorial, VFX and the colorist. It does not replace the script supervisor’s report, which follows the story and continuity: the two documents work together.
The take table as it appears in the PDF, scaled down: 15 rows on the first page, 17 on the second. Columns are grouped by take, lens, camera, timecode and outcome.